Islay Hill Case Study

CASE STUDY ISLAY HILL 5Kw Evance 9000 on a good clean open site

10m mast being bolted together.






Mast with base in background.






Inside of turbine hub








Turbine being supported while casing is assembled prior to raising hydraulic tower.

Turbine ready with hydraulic ram installed ready to lift. We were still on site a 10pm. It was a long day but a lovely sunset.