Allerdean Case Study

Allerdean Mill, Northumberland

 

The equipment is loaded up and off we go to Allerdean Mill to install another wind turbine.

 

The site to benefit from the turbine is a small holding in north Northumberland. The wish from the small holder was to be more self sufficient and reduce the carbon footprint of the business. The average windspeed for this site  is about 5.6m/s at 10m above ground level.

 

The photograph right shows the open site for the turbine to be sited in.

Track across paddock leading to the site of the turbine.

Wiring set up for the evance 9000 at Allerdean Mill using two sma 2500 windy boy inverters.

Below is the completed installation